Jump to content

Modular houses - building tips & inspirations


TheOrcKing

Recommended Posts

  • Replies 990
  • Created
  • Last Reply

Top Posters In This Topic

Please excuse the cross-post, but what do people in this dedicated thread think about this underground extension and the general idea of not building something into/onto a Modular but putting a complete set beneath it? Do you think there is a demand for something like this among Modular collectors (or more likely one-time buyers?)?
 

https://ideas.lego.com/content/project/link/d5c2a435-8082-40f6-a76c-697b14ae7317

1.thumb.jpg.836a92f7fbf5ee3ef5157b0e70c950b2.jpg

  • Like 1
Link to comment
Share on other sites

I would think the market for something like this is small. I think most people just build and forget.

Putting something under a modular is a process. One way would be to modify the build it sits on to accept a baseplate. It obviously can’t connect without something to interface to what’s on the baseplate.

The second would be to take the baseplate out of the equation. Start the build on a plate and go from there.

Link to comment
Share on other sites

16 minutes ago, Alpinemaps said:

I would think the market for something like this is small. I think most people just build and forget.

Putting something under a modular is a process. One way would be to modify the build it sits on to accept a baseplate. It obviously can’t connect without something to interface to what’s on the baseplate.

The second would be to take the baseplate out of the equation. Start the build on a plate and go from there.

You actually do connect the Basement only by putting 3 to 4 clips onto the edges of the Modular's Baseplate, after removing/replacing the tiles there. This should take about 20 seconds - that's a rather short "process":

7_Baseplate_dritte.thumb.jpg.bdf423798f25238a27baf33bba066d26.jpg

Edited by Frank Brickowski
  • Like 2
Link to comment
Share on other sites

You actually do connect the Basement only by putting 3 to 4 clips onto the edges of the Modular's Baseplate, after removing/replacing the tiles there. This should take about 20 seconds - that's a rather short "process":

http://bp-forum.s3.amazonaws.com/monthly_2020_09/7_Baseplate_dritte.thumb.jpg.bdf423798f25238a27baf33bba066d26.jpg

Oh that’s cool. Make it easy and people would be much more interested
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.



×
×
  • Create New...